HOW TECHNOLOGY IS TRANSFORMING CARGO TRANSPOTATION

The Vietnam project, which began construction in 2014, will take four years to build. All heavy oilfield components are manufactured domestically and then secured in frame boxes before being stored and transported by sea.

The crane accompanies the ship into the hold to assist with lifting operations at the destination port.

The image above shows the effect after the tank is hoisted onto the ship and secured.

After the large items cleared customs at the destination port, they were arranged for delivery by vehicle, as shown in the picture above.